datasheetbank_Logo
Технический паспорт Поисковая и бесплатно техническое описание Скачать

IRF7480MTRPBF Просмотр технического описания (PDF) - Infineon Technologies

Номер в каталоге
Компоненты Описание
Список матч
IRF7480MTRPBF
Infineon
Infineon Technologies Infineon
IRF7480MTRPBF Datasheet PDF : 12 Pages
1 2 3 4 5 6 7 8 9 10 Next Last
IRF7480MTRPbF
10
1
D = 0.50
0.20
0.10
0.1
0.05
0.02
0.01
0.01
0.001
1E-006
SINGLE PULSE
( THERMAL RESPONSE )
Notes:
1. Duty Factor D = t1/t2
2. Peak Tj = P dm x Zthjc + Tc
1E-005
0.0001
0.001
0.01
0.1
t1 , Rectangular Pulse Duration (sec)
Fig 14. Maximum Effective Transient Thermal Impedance, Junction-to-Case
1000
Allowed avalanche Current vs avalanche
100
pulsewidth, tav, assuming Tj = 125°C and
Tstart =25°C (Single Pulse)
10
1
Allowed avalanche Current vs avalanche
pulsewidth, tav, assuming  j = 25°C and
Tstart = 125°C.
0.1
1.0E-06
1.0E-05
1.0E-04
1.0E-03
1.0E-02
tav (sec)
Fig 15. Avalanche Current vs. Pulse Width
1.0E-01
100
TOP
Single Pulse
BOTTOM 1.0% Duty Cycle
80
ID = 132A
60
40
20
0
25
50
75
100 125 150
Starting TJ , Junction Temperature (°C)
Fig 16. Maximum Avalanche Energy vs. Temperature
Notes on Repetitive Avalanche Curves , Figures 15, 16:
(For further info, see AN-1005 at www.irf.com)
1.Avalanche failures assumption:
Purely a thermal phenomenon and failure occurs at a
temperature far in excess of Tjmax. This is validated for every
part type.
2. Safe operation in Avalanche is allowed as long asTjmax is not
exceeded.
3. Equation below based on circuit and waveforms shown in Figures
23a, 23b.
4. PD (ave) = Average power dissipation per single avalanche pulse.
5. BV = Rated breakdown voltage (1.3 factor accounts for voltage
increase during avalanche).
6. Iav = Allowable avalanche current.
7. T = Allowable rise in junction temperature, not to exceed Tjmax
(assumed as 25°C in Figure 14, 15).
tav = Average time in avalanche.
D = Duty cycle in avalanche = tav ·f
ZthJC(D, tav) = Transient thermal resistance, see Figures 13)
PD (ave) = 1/2 ( 1.3·BV·Iav) = T/ ZthJC
Iav = 2T/ [1.3·BV·Zth]
EAS (AR) = PD (ave)·tav
6
2016-5-4

Share Link: 

datasheetbank.com [ Privacy Policy ] [ Request Datasheet ] [ Contact Us ]